Hi there.
Migratin PF 2010->2013.
PF EDB on 2010 is about 30 GB long. Didn't check how many white space is inside, but that currently isn't the issue.
We are having problems that batch public folder migration process ends with fail, and we need to resume it.
The 2nd problem is that is extremly, extremly slow. For example transfering 25MB (if we check details of batch process) did in 5 hours.
Any suggestions how to speed things up?
With best regards
bostjanc