I have a client that has a physical Exchange 2003 server and they've requested to have a new Exchange server purchased and deployed with Server 2012/Exchange 2013. I know you can't go straight from 2003 to 2013, but what would be my best bet to get
the client running on 2013 and off the old 2003 server? I've read the articles that say upgrade to 2010 then upgrade to 2013 if needed. The problem with this is my company does NOT do in-place upgrades. I'd need a 2 new/temp server to migrate
from 2003 to 2010 and then from that temp 2010 server to the new 2013 server. Is there a clean way to dump user pst files and then import them in to the new Exchange 2013 server without having to build a temp Exchange 2010 server? The company in
question only has 39 users so it's small enough we can do some manual work if needed.
↧