We are preparing to install SP1 (CU4 ?) for Exchange 2013 (e2013) on our production system.
We have done that in our test system.
The production system has more databases and more mailboxes and data in each database, than the test system.
Seems like we read someplace that SP1 has an update to the "database schema" (in addition to the AD Schema update).
Thought that this database work might require extra time.
Will the SP1 install run longer because of the larger and more numerous databases ?
Thanks.
=====